
Roll over image to zoom in



EXTENSION POLE PAALUPISTE 2,00m HOT DIP G
Using an extension pile, the screw pile length can be extended by 2.00 meters.
With an extension pile, the screw pile length can be extended to the desired length. The extension pile is attached to the screw pile using an extension coupling, which is a separate optional accessory D60.3_2.9Z. The extension pile is attached to the screw pile using the extension coupling and two M16x80mm hex head bolts. Insert the extension coupling into the screw pile and ensure that the bolt holes are aligned. Insert the M16x80 hex head bolt through the screw pile and extension coupling and tighten from the other end using a nut with a spanner or socket wrench. Repeat this process with the extension pile.
A screw pile screwed into the ground is a fast and hassle-free foundation method for all construction. Installation causes no vibration or noise and requires no major earthmoving. Thus, the soil remains undisturbed and the environment unharmed. Additionally, no frost insulation is required when the screw pile’s helix is screwed below the frost line. Moreover, screw piles enable foundations to be installed in locations where other foundation methods are not easily feasible, such as on weak soils or at sites with difficult access.
This product description is an automated translation of the original Finnish description.