
Roll over image to zoom in




Video
SCREW POLE PAALUPISTE MACHINE INST 2,00m HOT DIP G
Product code
CFW837
The screw pile is an extremely fast and hassle-free foundation method. Installation causes no vibration and requires no major earthworks, so the soil remains undisturbed and the environment unharmed. Length 2.00 m. Machine-installed.
- Extremely durable model designed for machine installation
- Pipe 60.3×2.9mm
- Flange diameter 200mm, material thickness 8mm
- Material S420MH/355J2H
- Hot-dip galvanized
- Requires machine installation
- 50-year warranty
- Manufactured in Finland
- The pile point is an EN 1090 certified company
- Screw piles are manufactured in accordance with CE marking requirements
- Fast installation saves labor and equipment costs
- No major earthworks, frost insulation, drainage, or concrete and formwork work
- Cost-effective to transport and store
- The load-bearing capacity of the screw flange reduces pile length requirements
- Requires almost exclusively only one site visit
- Lightweight installation equipment
- The environment remains clean and undamaged
Product details
Technical specifications
Product class (ETIM)Accessories/spare parts for utility pole (EC003512)
Type of accessory/spare partOther
MaterialSteel
Surface protectionHot-dip galvanised
UV resistantyes
Diameter60 mm
Length2000 mm
Product codes
SAPCFW837
HPACCFW837
PLCCFW837
GTIN/EAN6430035570065
Manufacturer part numberB2000/150/60.3_2.9Z
Vendor material number501069619
Basic information
Package measurements (L x W x H)2000 x 150 x 150 mm
Package volume45 l
Package weight9.4 kg
Base uniteach
Package units1
Package contents–
UNSPSC31162307
BrandPAALUPISTE
VendorKESKO OYJ / RT
The country of origin stated by the supplierFinland